<div dir="ltr"><div class="gmail_extra"><div class="gmail_quote">On Tue, Nov 12, 2013 at 12:40 PM, Ian Evans <span dir="ltr">&lt;<a href="mailto:dheianevans@gmail.com" target="_blank">dheianevans@gmail.com</a>&gt;</span> wrote:<br>

<blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div dir="ltr"><div><div>Probably under my nose, but what&#39;s the correct way of temporarily extending one show&#39;s recording.<br>

<br></div>e.g. SNL was delayed 30 minutes because of a game on NBC. While it was recording I edited the sked to add 30 mins, but then all future recordings were 30 minutes longer too.<br>
<br></div>Am I missing an obvious &quot;just extend this one?&quot;<br></div><br></blockquote></div>Not sure about how to get there using MythFrontend, but in Mythweb, if you click on the upcoming or currently recording program on the Upcoming Recordings screen and select the &quot;Record this specific showing&quot; option it will create an override schedule for just that particular showing. Then you can modify the other items such as the end late and it will only apply to that one. I think when I tried it I had some flaky behavior with it so I set up the override first (select &quot;Record this showing&quot;) and then clicked Save, then went back and made the other changes and saved those separately.<br>

<br></div><div class="gmail_extra">Karl<br></div></div>