<div>On Tue, Apr 22, 2008 at 9:17 AM, Udo van den Heuvel &lt;<a href="mailto:udovdh@xs4all.nl">udovdh@xs4all.nl</a>&gt; wrote:<br></div>
<div class="gmail_quote">
<blockquote class="gmail_quote" style="PADDING-LEFT: 1ex; MARGIN: 0px 0px 0px 0.8ex; BORDER-LEFT: #ccc 1px solid">
<div class="Ih2E3d">Kevin Kuphal wrote:<br>&nbsp;&gt; Maybe not, but it&#39;s also not likely to hit the radar of many developers<br>&gt; because it is an unusual configuration. &nbsp;I think the limiting of program<br>&gt; data is your best option because it fits best in your setup<br>
<br></div>Could I myself somehow easily limit the scheduler to only look forward<br>for XX hours by changing some sql or C in the sourcecode without deeply<br>affecting the functioning of the program?<br>(I can do slight changes to C and some SQL...)</blockquote>

<div>&nbsp;</div>
<div>I&#39;m not sure why you think modifying the C code or SQL would be better for your system than limiting programming data to 1 or 2 days using standard options on mythfilldatabase...</div>
<div>&nbsp;</div>
<div>Kevin</div></div>